Close

Directional Drilling Project

Directional Drilling

Directional drilling was chosen as a cost-effective alternative to conventional trenching excavations.  Our Work area was confined to the points of entry and exit, causing less disruption to the work area no disruption to road traffic, rail traffic, with no impact on landscapes. TCG directional drilling equipment was used to install Fiber Optics conduit. TCG’s trenchless drilling equipment works from the surface with no need for deep excavations and provides a much quicker process compared to open trenching, and in many cases has lower overall costs, since there is no need for costly restoration to pavement and landscaping.

Client

Trans-Tel

Contract Value

$1,600,000

Location

Oklahoma

Scope of Work

Drill and pull back 24 miles of 2" Fiber Optic Conduit. Place incidentals, handholds, pedestals.

With a legacy of integrity, efficiency, attention-to-detail and a can-do attitude, our clients know they can trust Timberline to do the job right.